The building manifest is an important tool for us at Mazemap. It helps our technicians to place the buildings in the right location in the campus and the floors in the correct order in the building.
As you can see in the sheet, each floor gets their own row. The information you are adding in each row is connected to the floor indicated by the filename in the first column.
...
What goes in each column?
...
Floor number: The level of the floor (ground floor is one, -1 is basement, Note: 0 is not in use in z-levelling)
Floor name: Name of the floor.
...
from outside and accesses between the buildings. It is very important especially if we have big campuses.
...